Incoming CEO Brandon Craig drives BHP's Americas leadership split to boost regional growth.

BHP is confronting a potential $2.3 billion cost overrun at the Jansen potash project in Canada, underscoring financial and operational pressures even as leadership changes are enacted.
Jessica Farrell brings more than 20 years of experience across commodities and jurisdictions (formerly Western Australia Nickel Asset President and VP Innovation) and has been appointed President North America, with an interim hold on President South America until the role is permanently filled.
The leadership reshuffle is phased, with Farrell’s North America appointment effective 1 July 2026, and subsequent changes (including Edgar Basto moving to Chief Enterprise Performance Officer and Geraldine Slattery’s expanded Copper South Australia remit) taking effect on 1 September 2026.
Geraldine Slattery, President of Australia, will assume responsibility for Copper South Australia, effectively consolidating all of BHP’s Australian operating assets under a single leadership umbrella.
Edgar Basto will become Chief Enterprise Performance Officer, with direct reporting to the CEO and a focus on health, safety, security, the BHP Operating System, and strengthening contractor safety and enterprise-wide discipline.
BHP is splitting its Americas leadership in two, replacing a single President Americas role with separate North America and South America positions. Jessica Farrell takes over as President North America on July 1, 2026, and will hold South America on an interim basis until a permanent appointment is made, according to Sharecast.
Incoming CEO Brandon Craig — who starts officially on July 1 — is driving the reshuffle. It comes as BHP faces a $2.3 billion cost overrun at its Jansen potash project in Canada, pushing that project's total estimated cost from $4.9 billion to $6.9 billion, per Resources Review.
The unified Americas presidency was always a wide brief. North America centers on the Jansen potash mine in Saskatchewan and the Resolution Copper project in Arizona — both large greenfield builds with heavy regulatory complexity. South America is dominated by Escondida in Chile, the world's largest copper mine, where water scarcity and labor relations demand a different playbook entirely, according to Discovery Alert.
Craig himself held the Americas role since March 2024 before being tapped for CEO. He said the new structure will ensure BHP has "the right mix of skills to deliver BHP's strategy and pursue our growth agenda," per Resources Review. Farrell brings over 20 years of experience across iron ore, copper, and nickel, and previously served as Asset President of Nickel West.
BHP's warning on Jansen Stage 2 landed on June 18, just days before the leadership announcement. The project is only 16% complete as of May 2026, and its cost has ballooned by $2.3 billion. First production from Stage 2 has been pushed back to 2031, two years later than the original 2029 target, according to GuruFocus.
BHP shares fell as much as 4.4% in Sydney after the disclosure, per Discovery Alert. Critics noted this is the third time BHP has exceeded cost estimates for Jansen. Former MP Erin Weir pointed out that Saskatchewan law lets BHP write off 120% of capital costs against future production taxes — softening the blow for the company while the public absorbs the overrun.
Two more changes take effect September 1. Edgar Basto, a BHP veteran since 2003 and the outgoing COO, shifts to the newly created Chief Enterprise Performance Officer role. He will report directly to Craig and focus on health, safety, security, and BHP's Operating System — a company-wide discipline framework, according to Sharecast.
Geraldine Slattery, President of Australia, will absorb Copper South Australia into her remit. That puts the Olympic Dam copper-uranium mine — one of BHP's most strategically important assets — under her direct control. The move unifies all of BHP's Australian operations under a single leader, which analysts at Discovery Alert see as a prerequisite for a large-scale integrated expansion of Olympic Dam.
Farrell's assignment is unusually demanding. She will manage North America's complex greenfield projects while simultaneously holding the South America brief on an interim basis. Escondida alone accounts for a major share of BHP's copper output — the company targets 1.9 to 2.0 million tonnes of total copper production in FY2026, per BHP's official guidance.
How quickly BHP fills the permanent South America role will signal whether the split is a clean structural fix or a stopgap, according to Discovery Alert. Vandita Pant, Caroline Cox, and Jad Vodopija will retain expanded roles covering finance, governance, and people leadership to help stabilize the transition. The full new structure is not complete until September 1, leaving a two-month window where much of it rests on interim arrangements.
Publishers
11
Articles
51
Reach
62